Marshall Day House, Taunton School

Marshall Day House,
Taunton School

Previous slide
Next slide

Project Description

As part of an ongoing program of works with Taunton School, we were appointed to undertake working drawings and oversee the installation of a new mezzanine floor within Marshall Day House, to provide additional space for the boy’s common room.

SHARE

Related Projects

Fore Street, Bridgwater

Fore Street, Bridgwater

Previous slide
Next slide

Project Description

Full refurbishment project of this former Building Society building providing services for Somerset NHS Foundation Trust.

Stone + Partners worked closely with the conservation officer to give this Grade II listed building in Bridgwater a new lease of life, providing community services along with staff working areas.

SHARE

Related Projects

New Ophthalmic Theatre Suite, Musgrove Park Hospital

New Ophthalmic Theatre Suite,
Musgrove Park Hospital

Previous slide
Next slide

Project Description

Stone + Partners were appointed to obtain planning permission for a new modular Ophthalmic Theatre Suite liaising with the specialist healthcare facilities provider Module Co who designed and supplied the modular build system, together with working drawings for a link corridor to the existing building providing access for staff and patients.

SHARE

Related Projects

Extension to Mount Vets Veterinary Hospital, Wellington

Extension to Mount Vets
Veterinary Hospital, Wellington

Previous slide
Next slide

Project Description

Stone + Partners were appointed to obtain planning permission, prepare working drawings/tender documents and oversee the construction of a single storey extension to accommodate 2 additional consulting rooms, pharmacy walk through, and a rear link corridor to the existing building with separate access for staff and patients. 

Link to post on Mount Vets Facebook page with video introducing the new facilities: https://fb.watch/lldI2B0jTV/

SHARE

Related Projects

New Early Years Centre, Castle Batch School, W-S-M

New Early Years Centre, Castle Batch School, W-S-M

Previous slide
Next slide

Project Description

Design and construction of this Early Years Facility for The Priory Learning Trust, working with Kennet Construction to obtain planning permission and working drawings to enable the project to be delivered within the very tight deadline.

“Kennet Construction Ltd are delighted to have delivered another successful project for The Priory Learning Trust at Castle Batch School. Kennet Construction Ltd was appointed Main Contractor for the design and build of a new Early Years facility and were given an outline remit to develop a planning application submission. This was made possible with the help of Stone + Partners Architecture with whom Kennet Construction has a good working relationship from previous projects. The high level of professional service from Stone + Partners Architecture meant Kennet were able to quickly respond to Client needs and provide details at short notice. This was crucial in enabling a smooth transition from obtaining planning permission to starting construction on site. Furthermore Stone + Partners Architecture provided condition discharge liaison and helped with building regulation construction details for us to complete the project on time for the start of the new term. The whole project was delivered through the planning process and completed on site within 9 months which is an outstanding achievement.”

(Mark Ewing – Managing Director, Kennet Construction)

SHARE

Related Projects

Two new build dwellings, Merriott

New build houses, Merriott

Previous slide
Next slide

Project Description

Design and construction drawings produced for these two new build dwellings in Merriott working with Cherwyn Developments. 

“Cherwyn Developments have employed the services of the team at Stone and Partners for many years and found them to be professional, proactive and have a collaborative approach to delivering planning designs and working drawings. In these challenging times they are commercial in their approach to design and technical solutions and conscious of our increasing build costs” 

(Chris Winter – Cherwyn Developments)

SHARE

Related Projects

New Sixth Form Centre & Library, Taunton School

New Sixth Form Centre & Library,
Taunton School

Previous slide
Next slide

Project Description

This brand new Sixth Form Centre and Library was opened for students at Taunton School from September 2022.
The former upper and lower dining rooms have been transformed into a modern sixth form study centre with study pods, a social space and gender neutral toilets, and the newly relocated Carrington Library.
Décor in the refurbished sixth form centre has been designed with the help of Year 11 and Year 12 students.
This exciting project is part of the wider campus development plan, which includes new a state-of-the art international school and improved sports facilities.
 
‘Taunton school engaged Stone and Partners to provide architectural and contract admin services for the delivery of a significant development project over the summer of 2022- the creation of our new Carrington Library and Sixth Form Centre.
These spaces were to be constructed in the heart of our beautiful Grade II listed school building , providing modern, contemporary facilities without detriment to the ancient fabric of a landmark building in Taunton.
The works took place throughout a busy Spring and Summer term with little or no disruption to school life, despite being at the very heart of the campus.
Stone and Partners worked closely with the school and its key stakeholder communities throughout the entire design and delivery of the project and the result is an incredibly sophisticated but functional scheme that has attracted praise and interest across the whole school and beyond. The success of this project, in terms of visual appeal and the enjoyment our students and staff realise, from its use, is incredible and Stone and Partners can be justifiably proud to have completed this part of our school’s development history. The Library and Sixth form centre will serve our school admirably for years to come.’
(Terry Harris – Head of Estates, Taunton School)

SHARE

Related Projects

Almhouses, Taunton

Almshouses, Taunton

Previous slide
Next slide

Project Description

A competition bid for a contemporary take on almshouses for a local trust.  The building aimed to provide several residential units as well as office space on the ground floor. Key to the project was the provision of sufficient outdoor amenity space and views of nature for all occupants. The scheme focused on the use of a simple palette of good quality materials with careful brick detailing that referenced the surrounding historic buildings but didn’t juxtapose with other more contemporary neighbours.

SHARE

Related Projects

Barn Conversion, West Buckland

Barn Conversion, West Buckland

Previous slide
Next slide

Project Description

Extensive restoration and conversion of two derelict stone and cob barns to provide one large family dwelling incorporating new glazed entrance lobby link.

This bespoke commission included locally sourced materials, specified for their sustainability and aesthetic character.

The conversion also incorporated many energy saving measures.

SHARE

Related Projects

Cheddon Fitzpaine, Taunton

Cheddon Fitzpaine, Taunton

Previous slide
Next slide

Project Description

Extensive remodelling, refurbishment and extensions to this private house, retaining the original cottage but providing all modern facilities and a stylish new fully glazed garden room addition. Existing cob walls and oak beams were retained and exposed where feasible. The work included a new wood pellet boiler and solar panels for water heating.

SHARE

Related Projects